m.Stock by Mirae AssetOpen Demat Account
m.Stock by Mirae Asset
  • Cash
equity trading

K&R Rail Engineering Ltd

--(-%)
As on - | -

Volume Analysis

SPOT Pivot Levels

TypeClassicFibonacci
R1 --
R2--
R3--
PP- -
S1--
S2--
S3 --

Ratios

ParticularsDec 2024Sep 2024Jun 2024Mar 2024Dec 2023
ROCE-6.94-15.14-
ROE-3.56-9.94-
EPS2.622.30.63-1.790.5

Peer Comparison

No data available
Scrip NamePriceDaily changeM CapPE Ratio1 Year Return

Corporate Action

  • Board Meetings
  • Dividends
  • Bonus
  • Rights
  • AGM/EGM
  • Credit Rating
30 April 2025
<b>Format of Initial Disclosure to be made by an entity identified as a Large Corporate.</b><br/><br/> <table border=1px><tr> <td><b>Sr. No.</b></td> <td><b>Particulars</b></td> <td><b>Details</b></td> </tr> <tr><td>1</td><td>Name of Company</td><td>K&R Rail Engineering Ltd</td></tr> <tr><td>2</td><td>CIN NO.</td><td>L45200TG1983PLC082576</td></tr> <tr><td>3</td> <td>Outstanding borrowing of company as on 31st March / 31st December as applicable (in Rs cr)</td> <td>0.57</td></tr> <tr><td>4</td><td>Highest Credit Rating during the previous FY </td><td>NA</td></tr> <tr><td>4a</td><td>Name of the Credit Rating Agency issuing the Credit Rating mentioned in (4)</td><td>Not Applicable</td></tr> <tr><td>5</td><td>Name of Stock Exchange# in which the fine shall be paid in case of shortfall in the required borrowing under the framework</td><td>BSE</td></tr> </table> <br/><br/> <div> <div style=float:left;> We confirm that we are a Large Corporate as per the applicability criteria given under the SEBI circular SEBI/HO/DDHS/CIR/P/2018/144 dated November 26 2018. No</div> <br/><br/><br/> <div style=float:left;> Name of the Company Secretary: Narasimham <br/> Designation: Company Secretary and compliance officer <br/> EmailId: krrail1994@gmail.com</div> <div style=float:left;margin-left:50px;> Name of the Chief Financial Officer: Kulkarani Prahallada Rao <br/> Designation: Chief Financial Officer <br/> EmailId: krrailengineering@gmail.com</div> </div> <div> <br/> Date: 30/04/2025<br/><br/> <b>Note:<b> In terms para of 3.2(ii) of the circular beginning F.Y 2022 in the event of shortfall in the mandatory borrowing through debt securities a fine of 0.2% of the shortfall shall be levied by Stock Exchanges at the end of the two-year block period. Therefore an entity identified as LC shall provide in its initial disclosure for a financial year the name of Stock Exchange to which it would pay the fine in case of shortfall in the mandatory borrowing through debt markets. </div>
30 April 2025
<b>Format of the Annual Disclosure to be made by an entity identified as a Large Corporate.</b><br/><br/> <table border=1px> <tr> <td><b>Sr. No.</b></td> <td><b>Particulars</b></td> <td><b>Details</b></td> </tr> <tr> <td>1</td> <td>Name of Company</td> <td>K&R Rail Engineering Ltd</td> </tr> <tr> <td>2</td> <td>CIN NO.</td> <td>L45200TG1983PLC082576</td> </tr> <tr> <td>3</td> <td>Report filed for FY</td> <td>2024-2025</td> </tr> <tr><td colspan=3>Details of the Current block (all figures in Rs crore):</td><tr> <tr> <td>4</td> <td>2 - year block period (Specify financial years)* </td> <td>FY 2024-25 2025-26</td> </tr> <tr> <tr> <td>5</td> <td>Incremental borrowing done in FY (T)(a) </td> <td>0.00</td> </tr> <tr> <td>6</td> <td>Mandatory borrowing to be done through debt securities in FY (T) (b) = (25% of a)</td> <td>0.00</td> </tr> <tr> <td>7</td> <td>Actual borrowing done through debt securities in FY (T)(c)</td> <td>0.00</td> </tr> <tr> <td>8</td> <td> Shortfall in the borrowing through debt securities if any for FY (T - 1) carried forward to FY (T) (d)</td> <td>0</td> </tr> <tr> <td>8</td><td>Quantum of (d) which has been met from (c)(e)*</td> <td>0</td> </tr><tr> <td>9</td><td> Shortfall if any in the mandatory borrowing through debt securities for FY (T) { after adjusting for any shortfall in borrowing for FY(T - 1) which was carried forward to FY(T)}(f) = (b) - [(c) - (e)]{ If the calculated value is zero or negative write nil}*</td> <td>0</td> </tr> </table> <br/><br/><table><tr><td colspan=2><b>Details of penalty to be paid if any in respect to previous block (all figures in Rs crore):</b></td></tr> <tr><td>2 - year Block period (Specify financial years)</td><td>FY 2024-25 2023-24</td></tr> <tr><td>Amount of fine to be paid for the block if applicable Fine = 0.2% of {(d) - (e)}#</td><td>0.00</td></tr> </table> <div> <br/><br/><br/> <table><tr><td>Name of the Company Secretary :-</td><td>Narasimham</td></tr><tr><td>Designation :-</td><td>Company Secretary and compliance officer </td></tr> <tr><td>Name of the Chief Financial Officer :- </td><td>Kulkarni Prahallada Rao</td></tr> <tr><td>Designation : -</td><td>CFO</td></tr></table><div> <br/> Date: 30/04/2025<br/><br/></div>

About K&R Rail Engineering Ltd

Equity img
K&R Rail Engineering Limited was erstwhile established in the name of 'Axis Rail India Limited' on August 30, 1983. Prior to this, it was Gupta Carpets International Limited founded in 1998 to the ever growing demand for Mass Transportation & Bulk Logistics of Goods & Materials through the Indian Railway networks. Company name was changed to 'K&R Rail Engineering Limited' on March 28, 2018. The Co...
ISIN :INE078T01026
expAppScreen

Explore m.Stock AppInstant margin | Real-time charts | Quick order placements

Scan QR Code
qcScan
OR
Get it on
img113GPlayimg113Apple

FAQs

What is the share price of K&R Rail Engineering Ltd today on the BSE?

The share price of K&R Rail Engineering Ltd on the BSE is - as on -

What is ‘Today’s High & Low’ share prices of K&R Rail Engineering Ltd on the BSE?

Today’s High share price of K&R Rail Engineering Ltd on the BSE is - as on -
Today’s Low share price of K&R Rail Engineering Ltd on the BSE is - as on -

What is the market cap of K&R Rail Engineering Ltd today?

The market cap of K&R Rail Engineering Ltd is - Cr as on -

What price did K&R Rail Engineering Ltd shares open on BSE today?

K&R Rail Engineering Ltd opened at - on BSE as on -

What was yesterday 's closing price for K&R Rail Engineering Ltd shares on the BSE?

K&R Rail Engineering Ltd closed at - on BSE as on -